This information is a summary of Deliverable DA1.1: State of the art of CO2 capture technology in water and technique of carbonated water for irrigation.
This document is a summary of the deliverable DA2.1 which establishes the indicators that will be monitored throughout the project so as to learn about the environmental, technical, economic and social aspects of the development and implementation of a capture and storage system of CO2 emissions from an industrial ceramic facility in irrigation water for agricultural crops irrigation, in particular citrus crops.
This document is a summary of the deliverableDC1.1, which explains the design of the pilot plant according to the specifications.
The present document is a summary of deliverable DC2.1 which corresponds to task C2, Agronomic Study and Component Selection. It contains all the information relating to implementation of the irrigation head for pure commercial CO2 dosing in the initial selected plot (plot nº 1) and in the new and final selected plot under study (plot nº 2). All the agronomic values for the correct implementation and the necessary adjustments in the irrigation head have been determined.
This document is a summary of the deliverable DC3.1, which describes the pilot unit designed and constructed to capture CO2 in water.
The present document summarizes the deliverable DC3.2 which corresponds to task C3, “Design and construction of an industrial CO2 capture prototype. Capture start-up and Irrigation tests”. It contains all the information related to the implementation of the irrigation head for irrigation with carbonated water with industrial CO2 captured from EATOMIZADO. As it has been explained in deliverable DC2. 1, irrigation tasks corresponding to action C3 take place in the plot under study nº 2 (P2).
This is a summary of the deliverable DD1.1.1, that shows the values of the technical and economic indicators, for a sound development of the project. The values shown are the values of the indicators which starting date for follow-up is earlier than the present report.
This is a summary of the deliverable DD1.2.1, that shows the values of the environmental indicators, for a sound development of the project. The values shown are the values of the indicators which starting date for follow- up is earlier than the present report.
This report summarizes the deliverable DD2.0.0, which main objectives are:
- To verify the way the dissemination activities are taking place
- To monitor the evolution of communication activities through the indicators developed in the supervision protocol.
This is a summary of the deliverable DD2.0, the protocol that determines the indicators for monitoring the actions related to dissemination E1, E2, E3 and E4 actions, reinforces the supervision of La UNIO and establishes de reports objectives and frequency.
This report summarizes the deliverable DD2.1, that shows the development of actions E1 and E4 during the period from October 2015 to March 2016.
This report summarizes the deliverable DD2.2, that shows the development of actions E1 and E4 during the period from April 2016 to September 2016.
This report summarizes the deliverable DD2.3, that shows the development of actions E1, E2 and E4 during the period from October 2016 to March 2017.
The guidelines for applicants 2014 (LIFE Environment and Resource Efficiency branch) which applied to the first call for LIFE project proposals ("LIFE 2014") included a series of obligatory requirements in relation to the evaluation of the impact of the project’s results.
This document is a summary of the deliverable DE1.0, the Communication Plan of the LIFE FERTILIFE project, which objective is to disseminate the results and the experience acquired to all stakeholders and to promote the implementation of this new technology for CO2 capture.
In order to promote the extension and replicability of the project’s results and conclusions to the interested people, several materials have been edited and published. This document collects these dissemination materials as described in deliverable DE1.1.
This document summarizes the procedures for managing, directing and coordinating the project, as well as the internal organization chart of the coordinating beneficiary (Sistemas Avanzados Energéticos SL) according to its functions. These procedures are detailed in the deliverable DF1.3.